Sheridan Phase 3

Washington, DC

Site development provided consisted of 133 residential units. Vertical construction consisted of new construction of the residential units of which were concrete slab on grade, 13″ stepped concrete foundation walls, new plumbing, fire, mechanical and electrical systems, vinyl single hung windows, shingle, TPO and metal roofing, cement board siding, brick, vinyl plank, ceramic and vct flooring, kitchen and bath cabinets, drywall, painting, hollow metal doors and frames, new gutter and downspouts, insulation, stained wood and rubber vinyl stairs and other finishes.

 


Project Details

Project Type: , , , , , ,
Units: 133 rental townhomes (83 two-level, 40 one-level, 10 three-level)
Client: Sheridan South Limited Partnership
Value: $27 million

Awards

ABC Metro Washington Award of Excellence 2015

AGC Washington Contractor Award 2015

Client Testimonial

From the initial design stage thru the delivery of the building, the construction team has been involved in the process and has helped deliver a building on time and on budget. Most importantly, from an architect standpoint, WCS attention to details, expertise in this type of construction and quest for quality has carried the design team and the owner's visions to reality. The final result is a building that remains true to its original design with well executed details.
Dr. Abed Benzina, Principal
SK&I Architectural Design Group